Isle of Capri Bridge

64 pile sections, up to 1500OD, 16mm wall, with 25mm transitions and 50mm shoes, lifting lugs, coated and delivered.

Nowra Bridge

Approx 2,000 meters of mainly 1550 OD x 25mm Grade 350 piles, with 32mm transitions and 50mm shoes and shear keys. About half delivered to Murrarie, Brisbane for splicing and delivery on barge, and balance delivered on road to site.

Avon River Railway Bridge

Avon River Bridge, Stratford, Victoria is now complete, with trains travelling over the new bridge three months ahead of schedule.

BICT – Monopiles

As an additional scope to the manufacture of wharf piles for the Brisbane International Cruise Ship Terminal, ABFI Steel Group were awarded the manufacture and delivery of 4 x 4300 diameter x 25mm thick monopiles. These were supplied in 2 pieces with the overall length being 41 metres and each pile weighed in excess of […]

PW2PA – Joy Baluch Bridge

Joy Baluch First Piles 3

On the northern side of the existing dual lane bridge from Port Wakefield to Port Augusta, this project adds two dedicated east bound lanes.