Nowra Bridge
Approx 2,000 meters of mainly 1550 OD x 25mm Grade 350 piles, with 32mm transitions and 50mm shoes and shear keys. About half delivered to Murrarie, Brisbane for splicing and delivery on barge, and balance delivered on road to site.
Neville Bonner Bridge
28 piles 1200 OD and 1500 OD complete with driving rings and shoes, delivered
Isle of Capri Bridge
64 pile sections, up to 1500OD, 16mm wall, with 25mm transitions and 50mm shoes, lifting lugs, coated and delivered.
BICT – Monopiles
As an additional scope to the manufacture of wharf piles for the Brisbane International Cruise Ship Terminal, ABFI Steel Group were awarded the manufacture and delivery of 4 x 4300 diameter x 25mm thick monopiles. These were supplied in 2 pieces with the overall length being 41 metres and each pile weighed in excess of […]
Brisbane International Cruise Ship Terminal
The new cruise terminal has been designed to cater for the biggest cruise ships in the world and give passengers a world-class experience. It will become a gateway to the richness of our region, helping to showcase all that south-east Queensland has to offer, and a vital pillar of Brisbane and Queensland’s tourism economy. ABFI was contracted to manufacture […]
Smithfield Bypass, FNQ
Harwood Bridge
The new bridge over the Clarence River at Harwood is about 20 metres east of the existing bridge, 1.5 kilometres long and four lanes wide. The new bridge provides safer, smoother travel for motorists and eliminates the need for highway motorists to stop while the existing Harwood Bridge is raised for maritime users. The profile […]
PW2PA – Joy Baluch Bridge
On the northern side of the existing dual lane bridge from Port Wakefield to Port Augusta, this project adds two dedicated east bound lanes.
Avon River Railway Bridge
Avon River Bridge, Stratford, Victoria is now complete, with trains travelling over the new bridge three months ahead of schedule.
West Gate Tunnel
A transformational project for the city of Melbourne, construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road; a 2.8km eastbound tunnel and 4km westbound tunnel under Yarraville; a new bridge over the Maribyrnong River; an elevated road along Footscray Road to the Port […]