Sumners Rd overpass
Southport Yacht Club
730 OD x 16mm, 18mtr length piles, delivered within six weeks of order.
Jump Start Columns
High rise building construction – jump start columns ABFI manufactured the columns, inserted the reo bar, fabricated the column connections, arranged coating, and supplied each column to the site on a JIT basis.
Fabrication – correction of OEM faults
In this instance ABFI where contracted to cut to length and flange sections of a WIFI tower, where the original offshore manufactured sections where outside specification.
Mine shaft liner
Mine shaft liner, QLD